You've had a few quotes for an electrical inspection and they don't match up. One engineer quotes £120, another wants £280 for what looks like the same job on the same size property. That gap is normal, but it makes budgeting hard when you're a landlord juggling renewal dates or a homeowner trying to plan spending. So the real question is simple: how much does an electrical inspection cost in 2026, and why do prices vary so much between properties and providers?
The honest answer is that a standard EICR price depends on property size, number of circuits, and whether it's domestic or commercial. Most one and two bedroom flats sit at the lower end, while larger houses, HMOs, and commercial units cost more because there's simply more to test.
This guide breaks down current 2026 pricing by property type, explains what's included in a fair quote, and flags the extras (like remedial work) that often get missed until the invoice lands. By the end, you'll know whether the quotes in your inbox are reasonable or overpriced.
The price gap you're seeing isn't random. An electrical inspection cost shifts because engineers price the job on how long it actually takes, not on a flat rate. A one-bed flat with eight circuits takes an hour or two to test properly. A five-bed HMO with multiple consumer units, extensions, and outbuildings can take a full day. That difference in labour is where most of the cost comes from.
Every circuit in the property needs to be isolated, tested, and recorded individually. More bedrooms usually means more sockets, more lighting circuits, and more time on site. A studio flat might have six circuits; a large detached house can easily have twenty or more once you count kitchen, garage, and outdoor supplies.
Commercial units often carry three-phase supplies, distribution boards in multiple locations, and stricter documentation requirements under BS 7671. That pushes the EICR price higher than an equivalent-sized domestic property, even before you factor in access arrangements around trading hours.
Older installations with rewireable fuses, no earth bonding, or undocumented alterations take longer to test and require more careful fault-finding. A property last inspected 15 years ago will almost always cost more to check than one with a clean report from three years back.
The real driver of price isn't the postcode, it's how long the engineer needs to spend safely testing every circuit.
Qualified engineers with ten or more years' experience typically charge more per hour than newly certified ones, but they also spot faults faster and produce reports insurers and mortgage lenders trust without question. Location matters too: London day rates run higher than rural areas simply because of travel time, parking, and overheads.
|
Factor |
Impact on price |
|---|---|
|
Circuit count |
Higher count = more testing time |
|
Property type |
Commercial usually costs more than domestic |
|
Installation age |
Older wiring takes longer to assess |
|
Engineer experience |
More experience can mean higher hourly rate |
Understanding these variables helps you compare quotes properly instead of just chasing the cheapest number.
Getting a reliable quote starts with giving the engineer proper information before they price the job, not after they've turned up and found double the circuits you mentioned. Tell them the property type, the number of bedrooms, whether it's rented, and roughly when it was last tested. Vague descriptions lead to vague quotes, and vague quotes tend to grow once the engineer is on site.
Be specific about the details that actually affect labour time. A short call or email covering the basics saves both of you from a messy revision later.
Number of bedrooms, bathrooms, and habitable rooms
Whether the property is domestic, commercial, or an HMO
Age of the consumer unit and any known rewiring history
Access restrictions, such as tenants present or trading hours
Date of the last EICR and any outstanding remedial work
Insist on a fixed price wherever possible rather than an hourly estimate that can drift upward. A proper quote should state the number of circuits assumed, whether the report is included in that price, and what happens if extra faults are found during testing.
A fixed quote with clear inclusions protects you from surprise invoices far better than a vague hourly estimate ever will.
Compare at least two or three quotes on the same basis. If one figure looks unusually low, ask what's excluded, because that's usually where the real cost reappears later.
Once you understand what drives price, the actual numbers become easier to judge. Prices below reflect typical electrical inspection cost ranges across London and the South East for 2026, assuming a standard domestic or small commercial installation with reasonable access.

Use this as a benchmark when comparing quotes, not a guarantee, since condition and circuit count still shift the final figure.
|
Property type |
Typical EICR price (2026) |
|---|---|
|
Studio or 1-bed flat |
£120 to £160 |
|
2 to 3-bed house |
£160 to £220 |
|
4 to 5-bed house |
£220 to £300 |
|
HMO (per unit basis varies) |
£300 to £500+ |
|
Small commercial unit |
£250 to £450 |
|
Larger commercial premises |
£450 and up |
If a quote sits well below these ranges, ask what's been left out before you accept it.
HMOs carry extra scrutiny because each let room often has its own consumer unit, smoke detection circuit, or emergency lighting to check separately. That multiplies testing time well beyond a standard family home of the same square footage. Commercial premises face similar pressure from three-phase supplies and stricter documentation demands under BS 7671, which is the wiring regulations standard referenced by the Health and Safety Executive.
Geography also nudges these figures. Properties inside central London zones typically sit at the top of each range, while outer boroughs and the wider South East trend closer to the lower end once travel costs settle down.
Quotes rarely mention every cost you'll actually face, so the true electrical inspection cost often creeps up once the engineer starts work. Knowing which extras are common lets you budget properly instead of getting caught out by a revised invoice.
Weekend visits, evening slots, or tenanted properties needing coordinated access often carry a premium of £20 to £50 on top of the base price. Landlords managing several properties should factor this in when booking around tenant schedules rather than assuming the quoted figure covers every visit.
If the engineer flags a C1 or C2 code, that's a safety issue requiring repair before the report can pass, and remedial work is priced separately from the inspection itself. Expect a follow-up visit fee too, since most engineers charge again to confirm fixes and issue an updated certificate.
Budget for remedial work as a real possibility, not a rare exception, because most older properties throw up at least one fault.
Callout or travel fee for properties outside the standard service area
Certificate reissue fee if lenders or insurers request extra copies
Consumer unit upgrade if the board fails to meet current standards
VAT, which some quotes list separately from the headline price
Ask for these upfront so the final bill matches what you expected.
A failed EICR simply means the engineer found at least one fault serious enough to record as unsatisfactory, not that your whole property is unsafe to live in. Most reports that fail still pass once specific issues get fixed, so treat the result as a to-do list rather than a disaster.

Every fault gets a code that tells you how urgent it is, and this drives whether you need an electrician today or just before your next tenancy renewal.
C1: Danger present, requiring immediate remedial action
C2: Potentially dangerous, needing urgent attention
C3: Improvement recommended, not mandatory
FI: Further investigation required before a code can be confirmed
A C1 or C2 code means the property fails, but it also tells you exactly what to fix and how quickly.
Remedial costs vary hugely depending on the fault. Replacing a damaged socket might cost £40, while upgrading a consumer unit that no longer meets BS 7671 standards can run into several hundred pounds. Once repairs are done, you'll usually pay a smaller re-inspection fee, often £60 to £100, so the engineer can confirm the fix and issue an updated satisfactory certificate. Landlords should factor this two-step process into renewal timelines rather than assuming one visit covers everything.

By now the £120 versus £280 quotes make sense. Property size, condition, and whether you're domestic or commercial all shift the number, and a fair quote should explain exactly why it landed where it did. Don't just take the cheapest figure on the table; ask what's included, check the circuit count assumed, and budget for the possibility of remedial work before you commit.
Compare quotes on the same basis, keep your last EICR date to hand, and treat a failed inspection as a fixable list rather than a setback. Getting this right once means your next renewal runs smoother, whether you're managing one flat or a portfolio across London.
If you want a fixed price based on your actual property rather than a rough guess, get a quote from our engineers and know the real number before you book anything in.